Worksection blog — Page 20
PM school
SMART-based task setting is binding to fixed dates, metrics and parameters. By setting a goal in such manner, you make it specific, and you put it into a framework which should be observed.
6 July 2026 • 3 min read
PM school
In software development until the 1990s, everything was predictable and straightforward: a clear sequence of work processes, step-by-step planning, documentation, testing, and final product implementation...
7 April 2021 • 6 min read
PM school
Worksection allows you to separately configure your projects, create specific rules, and set restrictions in advanced settings for greater project control. In this article, we will explore the capabilities...
1 December 2020 • 3 min read
PM school
The opposition of Agile and Waterfall is not as much theoretical as it is practical. The choice of methodology that does not fit your project will, in the best-case scenario, slow down its development...
14 April 2019 • 8 min read
PM school
Kanban is the practice which helps to succeed with no necessity to use only agile methods. Significant changes are achieved through eliminating time losses, due management of narrow spaces with reduction of variability.
11 April 2019 • 12 min read
PM school
Nobody searches for Asana alternatives out of curiosity. Something broke first: a renewal quote came back higher, a feature turned out to be a paid add-on, or half the team quietly went back to running...
2 September 2026 • 23 min read
PM school
This question is posed by entrepreneurs in the industrial sector, producing material goods. However, the answer to this question will be beneficial for the service sector, IT, and social projects. Lean...
2 August 2026 • 16 min read